TEN-T core ports · onshore power supply · model v0.2.1
Shore-power demand, port by port, from public call data.
97 core maritime ports surveyed for public ship-call records. Where a port publishes calls with actual times, every call is run through the Valencia evidence waterfall into an hourly demand curve.
- Ports surveyed
- 97
- TEN-T core maritime ports, Regulation (EU) 2024/1679
- Ports modelled
- 3
- 47 more with call data being collected or recorded
- Visits in model
- 41,422
- merchant calls with actual arrival and departure
- Annual energy, 2025
- 236GWh
- mid power, full adoption, all modelled ports; site model on app data (index pending)
Ports by data status
Annual energy by port · GWh, mid power, full adoption
Hover a bar
All surveyed ports
| Port | Country | Tier | Status | Rows | Coverage | GWh | P95 MW |
|---|
GWh and P95 hour: mid power, full adoption, 2025. "pending": no model output yet for that port.